Bolin Gongguan Sewage Lifting Station Installation

Project Location: Bolin Gongguan

Equipment: burks B-Lift 55L Sewage Lifting Station

Application: Basement drainage

Tank Capacity
55 L
Max. Head
14 m
Max. Flow
36 m³/h
Motor Power
1.2 kW
Max. Solids Passage
55 mm
Outlet
DN80
Inlets
4×DN100 + 3×DN40

Project Overview

The basement drainage points in the basement of Bolin Gongguan sit below the municipal sewer line, so sewage cannot drain by gravity. A burks B-Lift 55L Sewage Lifting Station was installed for this project. Two stations each sit on a concrete plinth, raised for a clean pipe connection. The external design keeps the motor and check-valve assembly outside the tank, so routine servicing needs no opening of the tank cover. Compact and easy to install, it leaves the underground space cleaner and quieter.

Site Photos

Bolin Gongguan Sewage Lifting Station Installation

Close view of one unit — the station on its plinth and the outlet riser.

Bolin Gongguan Sewage Lifting Station Installation

Close-up of pipework and valve — the red ball valve and outlet cross pipe.

Bolin Gongguan Sewage Lifting Station Installation

Angle on the second unit — its pipe arrangement and plinth.

In Use

Since it was put into service, the basement drains smoothly and the basement is no longer limited by drain position. The station runs quietly and the room stays dry and tidy. With the pump mounted externally, checks and servicing are done outside the tank, with no disruption to the space.

Related Product: burks B-Lift 55L Sewage Lifting Station

More Cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT burks

Contact: Peter

Tel: 400-8565-222

Email: burkspumps@Gmail.com

立即咨询·免费选型报价