burks pumps
Language: Chinese English

Guoxin Yunxi Sewage Lifting Station Installation

Project Location: Guoxin Yunxi

Equipment: burks B-Lift 55L Sewage Lifting Station

Application: Basement bathroom drainage

Tank Capacity
55 L
Max. Head
14 m
Max. Flow
36 m³/h
Motor Power
1.2 kW
Max. Solids Passage
55 mm
Outlet
DN80
Inlets
4×DN100 + 3×DN40

Project Overview

The bathroom drainage points in the basement of Guoxin Yunxi sit below the municipal sewer line, so sewage cannot drain by gravity. A burks B-Lift 55L Sewage Lifting Station was installed for this project. Installed in a corner over the waterproofing during fit-out, with pipework and membrane handled together. The external design keeps the motor and check-valve assembly outside the tank, so routine servicing needs no opening of the tank cover. Compact and easy to install, it leaves the underground space cleaner and quieter.

Site Photos

Guoxin Yunxi Sewage Lifting Station Installation

Close view of the unit — the top-down angle and the large outlet pipe.

Guoxin Yunxi Sewage Lifting Station Installation

Side angle — the inlet pipe against the blue waterproofed wall.

Guoxin Yunxi Sewage Lifting Station Installation

Another angle — the station aligned with the reserved wall outlets.

In Use

Since it was put into service, the basement drains smoothly and the bathroom is no longer limited by drain position. The station runs quietly and the room stays dry and tidy. With the pump mounted externally, checks and servicing are done outside the tank, with no disruption to the space.

Related Product: burks B-Lift 55L Sewage Lifting Station

More Cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT burks

Contact: Peter

Tel: 400-8565-222

Email: burkspumps@Gmail.com

立即咨询·免费选型报价