burks pumps
Language: Chinese English

Lvcheng Yayuan Sewage Lifting Station Installation

Project Location: Lvcheng Yayuan

Equipment: burks B-Lift 28L Sewage Lifting Station

Application: Basement drainage

Tank Capacity
28 L
Max. Head
14 m
Max. Flow
26 m³/h
Motor Power
0.85 kW
Outlet
DN65
Net Weight
27.2 kg
Inlets
4×DN100 + 3×DN40

Project Overview

The bathroom drainage points in the basement of Lvcheng Yayuan sit below the municipal sewer line, so sewage cannot drain by gravity. A burks B-Lift 28L Sewage Lifting Station was installed for this project. The station stands in a corner, with insulated pipe bundles rising alongside the outlet. The external design keeps the motor and check-valve assembly outside the tank, so routine servicing needs no opening of the tank cover. Compact and easy to install, it leaves the underground space cleaner and quieter.

Site Photos

Lvcheng Yayuan Sewage Lifting Station Installation

Close view of the installed unit — the front of the station and the running display on the control box.

Lvcheng Yayuan Sewage Lifting Station Installation

Close-up of pipework and valve — the red ball valve and insulated pipe bundles.

Lvcheng Yayuan Sewage Lifting Station Installation

Another angle — the side inlet ports and the corner position.

In Use

Since it was put into service, the basement drains smoothly and the bathroom is no longer limited by drain position. The station runs quietly and the room stays dry and tidy. With the pump mounted externally, checks and servicing are done outside the tank, with no disruption to the space.

Related Product: burks B-Lift 28L Sewage Lifting Station

More Cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT burks

Contact: Peter

Tel: 400-8565-222

Email: burkspumps@Gmail.com

立即咨询·免费选型报价