Project: Suzhou Jiangshan Yue
Equipment: burks B-Lift 55L sewage lifting station
Application: Basement drainage (retrofit installation in pit)
This unit at Jiangshan Yue in Suzhou is a retrofit - the original drainage arrangement was no longer sufficient, so it was replaced with a burks B-Lift 55L sewage lifting station. The whole unit was placed into a square pit cut into the floor, with the pit opening flush with the floor tiles, so it does not take up the passageway. The yellow tank is paired with an external motor, the grey outlet pipe with a red valve handle runs along the wall, the white inlet pipe connects in from the wall, a burks controller is mounted on the wall, and the cables are neatly run along the wall. The hardest part of a retrofit is fitting a new system into an existing house without damaging the original floors and walls. This 55L unit sits snugly in the pit, the pipework runs along the wall, and once the pit cover is on, the floor is restored intact. Sewage is collected and lifted out, and all the drainage points in the house are back in normal use.
3/4 (controller wall-mounted, overhead shot)
4/4 (front view where the white inlet pipe and grey outlet pipe meet)
After the retrofit was completed, the unit sits snugly in the pit with the pit opening flush with the floor tiles, the grey outlet pipe with its red valve runs along the wall, the controller is wall-mounted, sewage lifting works normally, and the floor is restored intact.
Related product: burks B-Lift 55L sewage lifting station
More cases: Sewage Lift Cases
Press and hold the QR code to create a share image
Contact: Peter
Tel: 400-8565-222
Email: burkspumps@Gmail.com