burks pumps
Language: Chinese English

Xincheng Intercity Hotel Basement Sewage Lifting Station Retrofit

Project Location: Xincheng Intercity Hotel

Equipment: burks B-Lift 55L Sewage Lifting Station

Application: Hotel basement drainage retrofit

Tank Capacity
55 L
Max. Head
14 m
Max. Flow
36 m³/h
Motor Power
1.2 kW
Max. Solids Passage
55 mm
Outlet
DN80
Inlets
4×DN100 + 3×DN40

Project Overview

The original drainage equipment in the basement of Xincheng Intercity Hotel was undersized for the job and caused flooding. It was replaced with a burks B-Lift 55L sewage lifting station, matched to the actual discharge volume of the hotel basement. The external design keeps the motor and check-valve assembly outside the tank, so the maintenance team never needs to open the tank cover.

Site Photos

Xincheng Intercity Hotel Basement Sewage Lifting Station Retrofit

Close view of the installed unit — the station in the hotel utility area and its outlet riser.

Xincheng Intercity Hotel Basement Sewage Lifting Station Retrofit

Close-up of pipework — the outlet pipe and red valve section.

Xincheng Intercity Hotel Basement Sewage Lifting Station Retrofit

Wide angle — the station within the basement utility area.

In Use

After the replacement, the flooding problem in the hotel basement was resolved and drainage is smooth and stable again. The station runs quietly, and routine checks by the maintenance team are all it needs, with no impact on hotel operations.

Related Product: burks B-Lift 55L Sewage Lifting Station

More Cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT burks

Contact: Peter

Tel: 400-8565-222

Email: burkspumps@Gmail.com

立即咨询·免费选型报价