Project Location: Ziwei Gongguan
Equipment: burks B-Lift 55L Sewage Lifting Station
Application: Basement drainage (hidden in a floor pit)
The bathroom drainage points in the basement of Ziwei Gongguan sit below the municipal sewer line, so sewage cannot drain by gravity. A burks B-Lift 55L Sewage Lifting Station was installed for this project. The whole station is sunk into a floor pit, flush with the floor, taking no space once covered. The external design keeps the motor and check-valve assembly outside the tank, so routine servicing needs no opening of the tank cover. Compact and easy to install, it leaves the underground space cleaner and quieter.
Close view in the pit — the unit flush with the floor and its outlet ball valve.
Close-up of pipework and valve — the red ball-valve handle and the inlet pipes inside the pit.
Another angle — the pit opening and the surrounding floor protection.
Since it was put into service, the basement drains smoothly. Sitting in its floor pit, the station leaves the floor flat and unobtrusive, and runs quietly. When servicing is needed, lifting the cover is all it takes.
Related Product: burks B-Lift 55L Sewage Lifting Station
More Cases: Sewage Lift Cases
Press and hold the QR code to create a share image
Contact: Peter
Tel: 400-8565-222
Email: burkspumps@Gmail.com