Vanke Feicui Hushan Sewage Lifting Station Installation

Project: Vanke Feicui Hushan

Equipment: burks B-Lift 28L sewage lifting station

Application: Basement drainage (floor installation)

Tank volume
28 L
Max head
14 m
Max flow
26 m³/h
Motor power
0.85 kW
Free passage
50 mm
Outlet
DN65
Station type
Single-pump sewage lifting station
Control
Automatic start/stop
Installation
Floor installation
Application
Basement sewage
Motor type
External type, maintainable without opening the cover
Inlets
4×DN100 + 3×DN40

About This Project

When this 28L unit at Vanke Feicui Hushan was photographed, the renovation was not yet finished and the blue protective layer was still on the walls — a villa basement drainage system on its way from installation to handover. The drainage point sits below the municipal network, so sewage cannot flow out by gravity. One burks B-Lift 28L sewage lifting station was selected, installed on the floor in the corner, with a yellow tank and external motor. The white inlet pipe is connected with a black flexible joint, the grey outlet pipe runs along the wall, and the pipework is kept neat even against the unfinished walls. The protective layer and pipework appearing together in the frame show that neatness was not sacrificed to rush the work. Once the renovation is finished and the protective layer removed, the basement will be a space ready for immediate use, with the drainage system prepared a step ahead.

Site Photos

Vanke Feicui Hushan Sewage Lifting Station Installation

Close view — the yellow tank, external motor, white inlet pipe and grey outlet pipe.

Vanke Feicui Hushan Sewage Lifting Station Installation

Full view — the unit in the corner, the blue wall protection and the pipework along the wall.

Vanke Feicui Hushan Sewage Lifting Station Installation

Close view — the white inlet pipe, grey outlet pipe and tank connections.

In Use

After installation, the corner unit and the pipework along the wall are already in place. Once the renovation is finished, the basement can be used right away, with the drainage system prepared a step ahead and no need for rework on drainage.

Related product: burks B-Lift 28L sewage lifting station

More cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT burks

Contact: Peter

Tel: 400-8565-222

Email: burkspumps@Gmail.com

立即咨询·免费选型报价