Project: Hefei Shushan Mingzhu
Equipment: burks B-Lift28L850I sewage lifting station
Application: Basement drainage (corner floor-mounted installation)
In the basement of Shushan Mingzhu in Hefei, the walls are finished with grey marble-pattern tiles and the floor with tiles of the same tone, with the entire drainage system installed in the corner. The burks B-Lift 28L sewage lifting station sits on the floor against the corner, with a yellow tank and external motor, a burks controller mounted on the wall, a grey outlet pipe with a red valve handle running out along the wall, and a white inlet pipe connected from the left along the floor. A reserved toilet outlet remains on the wall to the right, and all piping is neatly arranged. The basement drainage point is below the municipal sewer network, so sewage cannot flow out by gravity. This 28L unit collects the basement sewage and lifts it out. Tucked into the corner, the equipment takes up little space, leaving the basement as a directly usable room — the refinement of a villa begins with these inconspicuous yet well-executed details.
Installation complete, equipment in place, piping neatly arranged, ready for the next stage of work.
Related product: burks B-Lift28L850I sewage lifting station
More cases: Sewage Lift Cases
Press and hold the QR code to create a share image
Contact: Peter
Email: burkspumps@Gmail.com
WhatsApp: +86 137 3919 8887
Inquiry: Send an inquiry ›
Mon–Fri 9:00–17:30 (Beijing time). Inquiries are answered within one business day.