Project: Hangzhou Greentown Taohuayuan
Equipment: burks B-Lift28L850I sewage lifting station
Application: Basement drainage (corner floor-standing installation)
In the basement of Greentown Taohuayuan in Hangzhou, the walls have been finished with white latex paint and the floor is covered with a protective film, and the entire drainage system is set up in this corner. The burks B-Lift 28L sewage lifting station sits floor-standing against the corner, with a yellow tank and an external motor, a burks controller mounted on the wall, a grey outlet pipe with a red valve handle running out along the wall, and a white inlet pipe coming in from the right along the floor - the pipework is neat and tidy. The basement drainage point is below the municipal sewer network, so sewage cannot drain by gravity; this 28L unit collects the basement sewage and lifts it out. The equipment is tucked into the corner and takes up no usable space, so the basement is a room that can be used directly - a villa's refinement begins with these inconspicuous but well-executed details.
Installation complete, the equipment is in place, the pipework is tidy, and it is ready for the next stage of work.
Related product: burks B-Lift28L850I sewage lifting station
More cases: Sewage Lift Cases
Press and hold the QR code to create a share image
Contact: Peter
Email: burkspumps@Gmail.com
WhatsApp: +86 137 3919 8887
Inquiry: Send an inquiry ›
Mon–Fri 9:00–17:30 (Beijing time). Inquiries are answered within one business day.