Project: Nanjing Greentown Rose Garden
Equipment: burks B-Lift55L1200I sewage lifting station
Application: Basement drainage (floor-standing corner installation)
The basement at Greentown Rose Garden was still at the finishing stage of renovation, with dark grey large-format tiles on the walls and dark floor tiles, and the whole drainage installation was placed in this corner. The burks B-Lift 55L sewage lifting station sits floor-standing in the corner, with a yellow tank and an external motor, a burks controller mounted on the wall, a grey outlet pipe with a red valve handle routed out along the wall, and a white inlet pipe connected in from the wall on the left, with all pipework kept clean and neat. The villa basement drainage points sit below the municipal network, so sewage cannot flow out by gravity; this 55L unit collects the sewage from the whole basement level and lifts it out. The equipment is tucked into the corner taking up no space, and once the renovation is finished the basement will be a room that can be used straight away - the refinement of the villa starts with details like these, inconspicuous but done properly.
Front close-up: yellow tank with external motor, controller mounted above the pipes
Wide distant view: the unit floor-standing in the corner, grey outlet pipe with red valve routed out along the wall
Side close-up: white inlet pipe connected in from the wall on the left, pipework kept clean and neat
Installation is complete, the equipment is in place, the pipework is neat, and it is ready for the next stage of work.
Related product: burks B-Lift55L1200I sewage lifting station
More cases: Sewage Lift Cases
Press and hold the QR code to create a share image
Contact: Peter
Email: burkspumps@Gmail.com
WhatsApp: +86 137 3919 8887
Inquiry: Send an inquiry ›
Mon–Fri 9:00–17:30 (Beijing time). Inquiries are answered within one business day.