burks pumps
Language: Chinese English

Xuhui Boyue Binzhou Mansion Sewage Lifting Station Installation

Project: Hefei Xuhui Boyue Binzhou Mansion

Equipment: burks B-Lift55L1200I sewage lifting station

Application: Basement drainage (corner floor-mounted installation)

Tank volume
55 L
Max head
14 m
Max flow
36 m³/h
Motor power
1.2 kW
Free passage
55 mm
Outlet
DN80
Station type
Single-pump sewage lifting station
Control
Automatic start/stop
Installation
Floor installation
Application
Basement sewage
Motor type
External type, maintainable without opening the cover
Inlets
4×DN100 + 3×DN40

About This Project

In the basement of Xuhui Boyue Binzhou Mansion in Hefei, which is still under renovation with freshly puttied walls, protective film on the floor, and boards and renovation materials stacked nearby, the whole drainage system is installed in the corner. A burks B-Lift 55L sewage lifting station sits on the floor against the corner, with a yellow tank and external motor, a grey outlet pipe with a red valve handle running upward along the wall, and a white inlet pipe connected along the floor from the right; the pipework is clean and tidy. The basement drainage point is below the municipal sewer network and sewage cannot flow by gravity, so this 55L unit collects the basement sewage and lifts it out. The equipment is tucked in the corner without taking up space, and once renovation is finished, the basement will be a room ready for direct use — the quality of the villa starts with these inconspicuous but well-finished details.

Site Photos

Xuhui Boyue Binzhou Mansion Sewage Lifting Station Installation

Front close-up: yellow tank with external motor, grey outlet pipe with red valve handle running upward along the wall

Xuhui Boyue Binzhou Mansion Sewage Lifting Station Installation

Wide full view: unit on the floor against the corner, basement still under renovation with protective film on the floor

Xuhui Boyue Binzhou Mansion Sewage Lifting Station Installation

Front close-up: white inlet pipe connected along the floor from the right, pipework clean and tidy

In Use

Installation complete, equipment in place, pipework neat, ready for the next step.

Related product: burks B-Lift55L1200I sewage lifting station

More cases: Sewage Lift Cases

Press and hold the QR code to create a share image

CONTACT Burks

Contact: Peter

Email: burkspumps@Gmail.com

WhatsApp: +86 137 3919 8887

Inquiry: Send an inquiry ›

Mon–Fri 9:00–17:30 (Beijing time). Inquiries are answered within one business day.