A prefabricated pumping station is not a catalogue pump. There is no shelf model to point at: the barrel size, the pumps, the internal pipework and the control system are all built around your site. That is why two stations that look alike in a photo can differ a lot in price and in how they behave once buried. Sizing one is a data exercise. Give the manufacturer six inputs, completely and accurately, and the design and quotation come back right in one pass. Give half of them, and you will be offered either a station larger than your project needs — capacity you pay for and bury — or one smaller than your peak inflow, which you will find out about in the next heavy rain.

1. Design flow. State the peak inflow, not the daily average, in litres per second or cubic metres per hour, and say whether the peak is storm-driven or process-driven. Flow sets the pump size, and it also sets the working volume of the barrel: the storage between the start and stop levels must buffer incoming water so the motors do not start too frequently. Recent project designs we have quoted sit at 4–10 L/s (14–36 m³/h) at heads up to 15 m; larger flows and heads are engineered to order.
2. Head, as a duty point. Head is the static lift from the low water level inside the barrel to the discharge point, plus friction losses in the pipework. Send the ground levels, where the discharge goes, and the approximate pipe run with it. The duty point is a pair — flow and head together — and the pump is selected at that pair, not at its maximum head. Maximum head is the end of the curve, not a working point.
3. Inlet and outlet levels and pipe sizes. The inlet depth below ground fixes the barrel height; the outlet diameter and direction shape the internal pipework and the site connections. If drawings exist, send them with the inquiry. An inlet depth that is wrong on paper is expensive in concrete: the foundation and the connections are built to the drawing, and there is no cheap adjustment on site.
4. The medium. Sewage, stormwater, industrial wastewater and irrigation water lead to different stations. Say what the liquid is, whether it carries solids or grit, whether a grille is expected, and what process sits upstream. The medium decides the pump type, the screening arrangement and the material direction, so a vague answer here makes every later decision vague as well.
5. Barrel size is a result, not a starting point. Once flow and levels are known, the diameter follows. On the burks BKS-TOP prefabricated pumping station the barrel is glass-reinforced plastic — glass fibre in grade 901 vinyl-ester resin, machine-wound in one piece — in a standard range of Ø1.5–3.0 m diameter by 3.5–6.5 m height, with other sizes engineered to the project, and the barrel is designed against flotation at the highest groundwater level. A wider barrel gives more working volume and gentler start frequency, but it also means a larger pit, a larger crane and a larger load on the road. Diameter is something you calculate from the duty, not a number you pick before the duty is known.
6. Power supply and control. State the site voltage and frequency. The pump arrangement is dry-installed submersible Sewage pumps, one duty and one standby: if the duty pump faults, the standby takes over automatically and the controller raises an alarm, instead of the station quietly filling up. Control is by PLC acting on liquid level, and the system can be connected to remote monitoring. If you need a remote monitoring link, a high-level alarm output or a standby power interface, ask at the inquiry stage — adding any of them after production is far more costly than drawing them in.
What happens after the six inputs arrive is a defined sequence: our engineers confirm the selection and return a station design and quotation; an approval drawing is issued for the station and confirmed with you; the station is then prefabricated and tested at the factory, and a factory test record travels with the delivered unit; the finished station ships as one unit and is lifted into the prepared pit. The supply boundary is stated plainly in the quotation: we supply the station and everything inside it, while civil works, the foundation and the connections outside the station are by others, listed item by item so there are no surprises on site. A project-built station of this kind typically takes 45–60 days, confirmed in the quotation.
Planning a station for a project? Send the six inputs — design flow, head, inlet and outlet levels with pipe sizes, medium, power supply and control needs — through the inquiry form on this site, by WhatsApp or by email, with your drawings if you have them. Our engineers will return a written station design and quotation, sized from your data rather than priced from a guessed barrel size.
Related products:
BKS-TOP prefabricated pumping station https://www.burks.cn/en/product/pumping-station.html
B-Lift 100L duplex sewage lifting station https://www.burks.cn/en/product/B-Lift100L-Sewage-lifter.html
Contact: Peter
Email: burkspumps@Gmail.com
WhatsApp: +86 137 3919 8887
Inquiry: Send an inquiry ›
Mon–Fri 9:00–17:30 (Beijing time). Inquiries are answered within one business day.